The permitting of geothermal power plants is a complex process that requires many steps and expertise. Below is a detailed description of how the process works.

1. Initiating the permitting process

At the start of the permitting process, the company planning to build a geothermal power plant must submit the necessary documentation and permit sustainable-materials-are-used-in-recycled-water-systems-and-water-storage-applications/">application to the authorities. This includes the design plan, environmental impact assessment, land use permit and other necessary documents.

2. Assessment by the authorities

The authorities will review the documentation submitted and carry out the necessary assessment. In doing so, they will check the design plan, the environmental impact assessment and other relevant documents. The authorities have the right to request additional information or modifications to the plan, if necessary.

3. Public consultation and public hearing

Public consultation and public hearings are generally required as part of the authorisation process. This gives local residents and stakeholders the opportunity to express their opinions and concerns about the geothermal power plant. The authorities take these opinions and concerns into account in their decision-making.

4. Granting or refusing a permit

The authorities will decide whether to grant or refuse a permit on the basis of the above steps. If all the necessary documentation is available, the design is appropriate and the results of the public consultation and public hearing are positive, they will usually issue a permit for the geothermal power plant.

5. Post-licensing obligations

After authorisation, the company operating the geothermal power plant must comply with the obligations imposed by the authorities. This may include regular inspections, monitoring of environmental impacts and submission of the necessary reports. The authorities will regularly monitor the operation of the plant to ensure compliance with the rules.

The licensing of geothermal power plants is therefore a long and thorough process, from planning to operation. The authorities closely monitor the design and environmental impacts to ensure sustainable and safe operation.